Thunderhead Engineering Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

Forum moved to https://forum.thunderheadeng.com

Author Topic: active floor  (Read 2655 times)

Sarnia

  • New Member
  • *
  • Posts: 7
    • View Profile
active floor
« on: January 27, 2010, 07:36:49 pm »

If I am working on a 2 storey building, I have created my ground floor geometry, but when I go to the upper floor, it puts it into the ground floor subfolder. Any way to make a specific floor active so the geometry will go to the right place?

Sarnia
Logged

Charlie Thornton

  • Thunderhead
  • *****
  • Posts: 851
    • View Profile
Re: active floor
« Reply #1 on: January 28, 2010, 10:37:22 am »

The way it should work is:  Above the tree, there is a Floor drop-down box that you can use to select the "active" floor.  When you have "Floor 0.0" selected, new geometry will be added to that floor and when you have "Floor 3.2" selected, new geometry should be added to that floor instead.

If you've got "upper floor" set as the current floor, and your new rooms are being added to "ground floor" then you've found a bug.  You can move things around after they've been created using the Change Group... action.
Logged